About Us
Renewable Energy Systems (RES) is one of the top renewable energy companies in North America. RES has constructed over 160 renewable energy projects with a total capacity of more than 10,000-megawatts (MW) around the world.RES has been active in North America since 1997, and has a renewable energy and storage construction portfolio that exceeds 8,000 MW and over 80 projects, and has constructed more than 650 miles of overhead and transmission lines. In addition, RES has a robust development pipeline of wind, solar, and energy storage projects across North America, and the company currently operates more than 250 MW of renewable energy and storage projects.
We developed and constructed our first project, the 60 MW Cameron Ridge wind farm in Tehachapi, California in 1999. In 2001, we co-developed and constructed the 278 MW King Mountain Wind Ranch in Texas, the largest wind project in the world at the time. In 2006, RES financed and completed construction of our first ownership asset in the U.S., the 60 MW Whirlwind Energy Center in Texas. In 2008, we completed our second owned project in Texas, the 166 MW Hackberry Wind Farm. Click on the “Play” icon below to watch a short video about RES in the Americas.
What distinguishes RES is our dedicated staff of professionals. Their combined knowledge and expertise is unsurpassed in the industry, and enables us to offer our clients a full suite of development and construction services. This ensures that projects are engineered for maximum efficiency and that they transition smoothly from one phase to the next.
We are committed to working with the community on all of our projects. We understand, first and foremost, that we are guests on the land. Since we are a family-owned company, we respect property rights, land ownership, and privacy. We are proud of our expertise in developing and constructing wind, solar, and energy storage projects that reflect our commitment to environmental sustainability while providing clean, secure, renewable energy to meet your needs for years to come.
RES’ northeast regional office is located in Old Saybrook Connecticut. The northeast development team has been previously responsible for approximately 600MWs of operational wind energy projects in New York.
Project Info
The Ball Hill Wind Energy project is an approximately 100MW wind farm proposed in the Towns of Villenova and Hanover in Chautauqua County New York.Villenova – Ball Hill SEQRA Findings
Villenova – Resolution of Town Board Adopting Local Law No. 2 of 2019
Villenova – Resolution of Town Board Adopting Local Law No. 3 of 2019
Supplemental Final Environmental Impact Statement 10-4-19
Supplemental DEIS 8-13-19 (9.2MB)
Appendix B Visual Resource Assessment – Saratoga Ball Hill Technical Memorandum June 2018
Appendix C Noise Assessment – Layout 092617 Sound Study Memo
Appendix E Communications Signals Correspondence
Appendix F Cultural Resource Correspondence – Bonafide Letter 7.23.18
Appendix F Cultural Resource Correspondence – Herter Achaeo No Effects letter
Appendix G Property Values Correspondence – 2018 – IREM Letter – Ball Hill Wind Energy Project
Appendix H.1 Wetland Del. Report Compiled_May2017
Appendix H.2 Wetland Del. Report Compiled_May2017
Appendix H.3 Wetland Del. Report Compiled_May2017
Appendix H.4 Wetland Del. Report Compiled_May2017
Appendix H.5 Wetland Del. Report Compiled_May2017
Appendix H.6 Wetland Del. Report Compiled_May2017
Appendix H-Wet Del Supplement Report-20180604
Appendix I Wetlands Mitigation Plan – FINAL 21.0056858 Ball Hill Wind Mitigation Plan 101818
Appendix J Decommissioning Study – Ball Hill Wind Farm Decommissioning Plan 2019-06-12
Appendix K – Ball Hill Wind Energy Net Conservation Benefit Plan
Appendix L Ball Hill Eagle Surveys 2016-2017
Appendix M – Cultural Resources Mitigation Plan
Appendix N – Ball_Hill_Wind_BBCS-2019
Appendix O – Public Comment and Response Log
Response to Comment dated 10/20/19
Chautauqua County Planning Board: Responses to Questions at July 11, 2018 Meeting (1004 KB)
June 26, 2018 Villenova Public Hearing – Responses to Questions and Comments (151 KB)
Comparative Visual Simulation of 2016 and 2018 Turbines (18 MB)
Ball Hill Wind Energy Project Impacts Summary (20 KB)
2018 Hanover Application (60 MB)
2018 Villenova Application (57 MB)
Final Environmental Impact Statement
Final Environmental Impact Statement for the Ball Hill Wind Project full documents:
These files are very large and may take a long period of time to download. If the process times out please utilize the separated files below. In addition, the full document is available for public review at the Town of Hanover Town Clerk Office (68 Hanover Road, Silver Creek NY 14136) and the Town of Villenova Town Clerk Office (1094 Butcher Road, South Dayton, NY 14138).
- Ball Hill ENB Notice FEIS 11-22-16 (21 KB)
- Final Environmental Impact Statement for the Ball Hill Wind Project – Volume 1 (286 MB)
- Final Environmental Impact Statement for the Ball Hill Wind Project – Volume 2 (337 MB)
Final Environmental Impact Statement for the Ball Hill Wind Project split documents:
In order to make this large document easier to download on private computers, the following Final Environmental Impact Statement files have been split up into text of the FEIS and each appendix. The full document is available for public review at the Town of Hanover Town Clerk Office (68 Hanover Road, Silver Creek NY 14136) and the Town of Villenova Town Clerk Office (1094 Butcher Road, South Dayton, NY 14138).
- Ball Hill ENB Notice FEIS 11-22-16 (21 KB)
- Ball Hill FEIS Text and Figures (2.4 MB)
- Appendix A – Updated Tables and Figures (3.7 MB)
- Appendix B – Turbine Specifications (1.2 MB)
- Appendix C – Project Drawings (22.1 MB)
- Appendix D – Material Safety Data Sheets (12.4 MB)
- Appendix E – Water Quality and Wetlands, Part 1 (38.5 MB)
- Appendix E – Water Quality and Wetlands, Part 2 (15.3 MB)
- Appendix F – Conceptual Wetland Mitigation Plan (787 KB)
- Appendix G – Agency Correspondence (6.0 MB)
- Appendix H – Bird and Bat Resources (1.5 MB)
- Appendix I – Visual Resource Assessment (8.4 MB)
- Appendix J – Sound Level Assessment Report (1.4 MB)
- Appendix K – Communication Surveys (500 KB)
- Appendix L – Complaint Resolution Plan (287 KB)
- Appendix M – Transportation (1.2 MB)
- Appendix N – Cultural Resources Surveys (1.6 MB)
- Appendix O – Architectural Resources Mitigation (198 KB)
- Appendix P – Health and Safety Plans (2.3 MB)
- Appendix Q – Property Valuation Study (1.4 MB)
- Appendix R – Decommissioning Plan (240 KB)
- Appendix S – Environmental Monitoring Plan (301 KB)
- Appendix T – Public Participation (6.9 MB)
Town of Villenova
- Ball Hill Wind Energy, LLC Amended Application Appendix J
- Notice of Public Hearing on Ball Hill Wind Energy, LLC Amended Application – Town of Villenova 10-13-16
- Wind Energy Facilities Law of the Town of Villenova
- SEQRA Findings
This file is very large and may take a long period of time to download. If the process times out please utilize the separated files below. In addition, the full document is available for public review at the Town of Hanover Town Clerk Office (68 Hanover Road, Silver Creek NY 14136) and the Town of Villenova Town Clerk Office (1094 Butcher Road, South Dayton, NY 14138).
- Ball Hill Wind Energy, LLC Amended Application for Special Use Permit and Wind Overlay District – Town of Villenova 9-28-16 (full document, 363 MB)
Amended Application for Special Use Permit and Wind Overlay District – Town of Villenova 9-28-16 split documents:
In order to make this large document easier to download on private computers, the following Amended Application files have been split up into text of the application and each appendix. The full document is available for public review at the Town of Hanover Town Clerk Office (68 Hanover Road, Silver Creek NY 14136) and the Town of Villenova Town Clerk Office (1094 Butcher Road, South Dayton, NY 14138).
- Amended Application Text and Figures (15.5 MB)
- Appendix A – Vestas 126, 3.45 MW Series Wind Turbine Brochure (462 KB)
- Appendix B – Memoranda of Lease (30.7 MB)
- Appendix C – FAA Advisory Circular 70/7460-1 L, Obstruction Marking and Lighting (8.5 MB)
- Appendix D – FAA Determinations of No Hazard to Air Navigation (14.5 MB)
- Appendix E – Agricultural Data Statement (197 KB)
- Appendix F – 2008 Environmental Assessment Form and 2015 Board Resolution (10.0 MB)
- Appendix G – Material Safety Data Sheets (23.5 MB)
- Appendix H – Ball Hill Wind Project, Final Visual Resource Assessment (34 MB)
- Appendix I – Working Draft Emergency Response Plan (400 KB)
- Appendix J – Sound Level Assessment Report, Ball Hill Wind Project (6.5 MB)
- Appendix K – Real Estate Consulting Report of Influence of Wind Farms on Residential Real Estate Values, Proposed Ball Hill Wind Energy Project (2.9 MB)
Town of Hanover
- Town of Hanover Wind Energy Facilities Law
- Notice of Hanover Public Hearing
- Town of Hanover Proposed Local Laws
This file is very large and may take a long period of time to download. If the process times out please utilize the separated files below. In addition, the full document is available for public review at the Town of Hanover Town Clerk Office (68 Hanover Road, Silver Creek NY 14136) and the Town of Villenova Town Clerk Office (1094 Butcher Road, South Dayton, NY 14138).
- Hanover Amended Application 10-6-16 (full document, 365 MB)
Hanover Amended Application 10-6-16 split documents:
In order to make this large document easier to download on private computers, the following Amended Application files have been split up into text of the application and each appendix. The full document is available for public review at the Town of Hanover Town Clerk Office (68 Hanover Road, Silver Creek NY 14136) and the Town of Villenova Town Clerk Office (1094 Butcher Road, South Dayton, NY 14138).
- Amended Application Text and Figures (36.4 MB)
- Appendix A – Vestas 126, 3.45 MW Series Wind Turbine Brochure (631 KB)
- Appendix B – Memoranda of Lease (39.9 MB)
- Appendix C– Agricultural Data Statement (516 KB)
- Appendix D – 2008 Environmental Assessment Form and 2015 Board Resolution (6.6 MB)
- Appendix E – Ball Hill Wind Project, Final Visual Resource Assessment (34.8 MB)
- Appendix F – FAA Advisory Circular 70/7460-1 L, Obstruction Marking and Lighting (8.4 MB)
- Appendix G – FAA Determinations of No Hazard to Air Navigation (14.6 MB)
- Appendix H – Sound Level Assessment Report, Ball Hill Wind Project (5.6 MB)
Supplemental Draft Environmental Impact Statement
- Ball Hill SDEIS (29.4 MB)
- Appendix A – Noble Ball Hill DEIS – Volume I (314.5 MB)
- Appendix A – Noble Ball Hill DEIS – Volume II (423.6 MB)
- Appendix A – Noble Ball Hill DEIS – Volume III (170.1 MB)
- Appendix B – Project Layout (9.3 MB)
- Appendix C – Draft Progress Wetland Delineation Report (151.3 MB)
- Appendix D – Preliminary Transportation Site Survey (1.1 MB)
- Appendix E – Stormwater Pollution Measures (102 KB)
- Appendix F – Draft EMP and ISMP (101 KB)
- Appendix G – Health and Safety (493 KB)
- Appendix I – Drain Repair (53 KB)
- Appendix J – Conceptual Wetland Mitigation Measures (138 KB)
- Appendix K – Bird Surveys (3.7 MB)
- Appendix L – Bat Surveys (107.5 MB)
- Appendix M – Visual Resource Assessment (189.5 MB)
- Appendix N – Decommissioning Plan (22 KB)
- Appendix O – Sound Level Assessment Report (8.2 MB)
- Appendix P – Communication Surveys (3.5 MB)
- Appendix Q – Agency Correspondence (4.9 MB)
- Appendix R – Obstruction Evaluation Analysis Report (4.9 MB)
- Appendix S – Cultural Resource Surveys (72.2 MB)
Please submit any comments to the Town of Villenova Town Clerk at VillenovaTownHall@hughes.net